Definitions[edit]

As with the definitions of high-speed rail, there is no universal definition of higher-speed rail either. The term has been used by government agencies,[8] government officials,[9] transportation planners,[10] academia,[11] the rail industry,[12] and the media,[13] but sometime with overlaps in the speed definitions. Some countries with an established definition of higher-speed rail include:
  • In Canada, according to the Surface Transportation Policy, Department of Transport, the speed range for higher-speed rail is between 160 and 240 km/h (99 and 149 mph).[4]
  • In India, according to the Minister of Railways, the speed range for India's higher-speed rail will be between 160 and 200 km/h (99 and 124 mph).[14]
  • In the United Kingdom, the higher-speed rail is used for upgraded tracks with train speeds up to 125 mph (201 km/h)[15]
  • In the United States, the term "higher-speed rail", as opposed to "high-speed rail", is used by regional planners in many U.S. states to describe inter-city passenger rail services with top speeds of between 90 mph (140 km/h)[16] and 110 mph (180 km/h).[17][18][19] This is the equivalent of the definition of "Emerging High-Speed Rail" as defined by the Federal Railroad Administration.[20] However, the Congressional Research Service defines "Higher Speed Rail" as rail services with speeds up to 150 mph (240 km/h) and defines rail services on dedicated tracks with speeds over 150 mph (240 km/h) as "Very High Speed Rail".[21]
    State-level departments of transportation and council of governments may use different definitions. Below is the list of known definitions of higher-speed rail which use some of the 5 speed levels, 80 mph (130 km/h), 90 mph (140 km/h), 110 mph (180 km/h), 125 mph (200 km/h) and 150 mph (240 km/h):
Agency / CouncilTop speeds (mph)Ref
California Department of TransportationUp to 125[22]
Minnesota Department of TransportationGreater than 90 but less than 125[23]
North Central Texas Council of Governments80—150[10]
Oklahoma Department of Transportation110—125[24]
Texas Department of Transportation110—125[24]
Virginia Department of Rail and Public TransportationUp to 110[19]
  • In Thailand, higher-speed rail, which is called medium-speed rail there, has top speeds of up to 250 km/h (160 mph).[25]

Speed limits[edit]

In Canada, the assumption about grade crossing is that operating higher-speed rail services between 160 and 200 km/h (99 and 124 mph) would require "improved levels of protection in acceptable areas".[26]
In the United States, railroad tracks are largely used for freight with at-grade crossings. Passenger trains in many corridors run on shared tracks with freight trains. Most trains are limited to top speeds of 79 mph (127 km/h) unless they are equipped with an automatic cab signalautomatic train stopautomatic train control orpositive train control system approved by the Federal Railroad Administration (FRA).[27] In developing higher-speed rail services, one of those safety systems must be used.
Additionally, the FRA establishes classification of track quality which regulates the speed limits of the trains with Class 5, Class 6, Class 7 and Class 8 for top speeds of 90 mph (140 km/h),[28] 110 mph (180 km/h), 125 mph (200 km/h) and 160 mph (260 km/h), respectively.[29] The FRA also regulates passenger train design and safety standards to ensure trains that operate at speeds of 80 mph (130 km/h) up to 125 mph (200 km/h) comply with its Tier I standard and trains that operate at speeds up to 150 mph (240 km/h) comply with its Tier II standard.[30]
Another limitation is the safety of grade crossings which limits how fast the trains can go. FRA regulations set speed limits for tracks with grade crossings as follows:[31]
  • For 110 mph (180 km/h) or less: Grade crossings are permitted. States and railroads cooperate to determine the needed warning devices, including passivecrossbucks, flashing lights, two quadrant gates (close only 'entering' lanes of road), long gate arms, median barriers, and various combinations. Lights and/or gates are activated by circuits wired to the track (track circuits).
  • For 110 to 125 mph (180 to 200 km/h): The FRA permits crossings only if an "impenetrable barrier" blocks highway traffic when a train approaches.
  • Above 125 mph (200 km/h): No crossings will be permitted.
In Europe, the limit is often 160 km/h (99 mph) over grade crossings.[32] In Sweden there is a special rule permitting 200 km/h (120 mph) if there are barriers and automatic detection of road vehicles standing on the track.[33] In Russia 250 km/h (160 mph) is permitted over grade crossings.[34]
With the above limitations, many regional transportation planners focus on rail improvements to have the top speeds up to 110 mph when proposing a new higher-speed rail service.[21]

Similar categories[edit]

In countries where there had been rail improvement projects in the later part of the 20th century and into the 2000s, there are inter-city rail services with comparable speed ranges of higher-speed rail, but they are not specifically called "higher-speed rail". Below are some examples of such services that are still in operation.
  • Europe: The InterCity services in many European countries have top speeds of mostly up to 160 km/h (99 mph), but it can go up to 200 km/h (120 mph)
  • Japan: The Mini-shinkansen in Japan are upgraded lines from narrow gauge to allow Shinkansen to pass through with top speeds of 130 km/h (81 mph).[35]However, the International Union of Railways recognizes the Mini-shinkansen lines as high-speed rail.[36]
  • Spain: Many inter-city rail services operated by Renfe Operadora, the state-owned company, are not classified as high-speed rail. Those services are Alaris,AltariaArco and Talgo (from Talgo III to Talgo VII) with top speeds of 160 and 200 km/h (99 and 124 mph)[37]
  • Sweden: SJ (Swedish Railways) operates inter-city rail services using X 2000 trains in major routes across the country with top speeds of 200 km/h (120 mph). The operator brands it as high-speed rail services;[38] however, the International Union of Railways only recognizes the 300 km/h (190 mph) line from Stockholmto Malmö and Goteborg as the only high-speed rail line in Sweden which is still in the planning stage.[36]

Rail improvement strategies[edit]

Cab display unit ofACSES, an approvedPTC system
There are many types of train that can support higher-speed rail operation, but the rail infrastructure needs to be upgraded prior to such operation. Since this is an upgrade to existing track currently in use, with busy traffic in some segments, there are challenges associated with the construction work that could potentially disrupt the train services. The followings are some strategies used by regional transportation planners and rail track owners for their rail improvement projects in order to start the higher-speed rail services.

Signal upgrades[edit]

In Australia, the increased top speeds from 130 to 160 km/h (81 to 99 mph) in the Regional Fast Rail project required a change to the signalling system to account for increased braking distance. Prior to the project, the system comprised a mixture of equipment from pre-WWImechanical signalling to the remote control systems of the 1980s. In some cases, operators needed to telephone the local operators to manually control the signal boxes. With the new speeds, the signalling needed to be computerized. The project employed the Solid State Interlocking with the newly laid fiber-optic communication between the components to use three computer systems to control the signals. When the output of one computer differs from the other two, the system will fail that computer and continue the signal operations as long as the outputs from the other two computers are consistent. The project deployed the Train Protection & Warning System which allows the system to automatically applies the brakes at a sufficient distance to stop the train if the driver does not control the speeds adequately. The project also incorporated Train Control and Monitoring System to allow real-time monitoring of the position of trains.[39]
In the United States, the first step to increase top speeds from 79 mph (127 km/h) is to install a new signal system that incorporates FRA-approved positive train control (PTC) system that is compatible with higher-speed rail operation.[40] There are both transponder-based and GPS-based PTC systems currently in use in the United States. By a mandate, a significant portion of the railroads in the United States will be covered by PTC by the end of 2015.[41]
Concrete ties on a BNSF line

Track improvements[edit]

To support trains that run regularly at higher speeds, the rails need to be reliable. Most freight tracks have wooden ties which cause rails to become slightly misaligned over time due to wood rot, splitting and spike-pull (where the spike is gradually loosened from the tie).[42] The concrete ties used to replace them are intended to make the track more stable, particularly with changes in temperature.[43] Rail joints are also an issue, since most conventional rail lines use bolts and fishplates to join two sections of the rail together. This causes the joint to become slightly misaligned over time due to loosening bolts. To make for a smoother ride at higher speeds, the lengths of rail may be welded together to form continuous welded rail (CWR). However, the continuous welded rails are vulnerable to stress due to changes in temperature.[44]
In Australia, the track condition before the Regional Fast Rail project could only support trains up to speeds of 130 km/h (81 mph). The tracks are with mixture of wooden and concrete ties. The rail weight varies but with majority being 47 kg/m (95 lb/yd). The track upgrade in the project included changing to use concrete ties and to use new standard of rail weight at 60 kg/m (121 lb/yd) in order to support the new top speeds of 160 km/h (99 mph).[45]
There may be restriction in maximum operating speeds due to track geometry of existing line, especially on curves. Straightening the route, where possible, will reduce the travel time by increasing the allowable speeds and by reducing the length of track. When straight routes are not possible, reducing the number of curves and lowering the degree of curvature would result in higher allowable speeds on those curves. An example is the elimination of three consecutive reverse curves in favor of one larger curve. Raising superelevation may be considered for sharp curves which significantly limit speed. The higher speeds on those modified curves, together with the higher superelevation, will require track modification to have transition spirals to and from those curves to be longer.[46]
Old turnouts may need replacement to allow trains to run through the turnouts at higher speeds. In the United States, some old turnouts have speed limit of 20 mph (32 km/h). Even with newer turnouts (rated #20), the diverging speed limit is still at 45 mph (72 km/h) which would significantly slow down the higher-speed train passing through those sections. High-speed turnouts (rated #32.7) are capable of handling maximum diverging speeds of 80 mph (130 km/h).[47][48][49]
In order to minimize the downtime to upgrade tracks, a track renewal train (TRT) can automate much of the process, replacing rails, ties, and ballast at the rate of 2 miles per day. In the United States, a TRT is used by Union Pacific Railroad on the track shared with future higher-speed rail service in Illinois area.[50][51]
For electrified track, the old catenary may need to be replaced. The fixed-tension catenary which is acceptable for low speeds may not be suitable for regular higher-speed rail services, where a constant tension is automatically maintained when temperature changes cause the length of the wire to expand or contract.[52]

Crossing improvements[edit]

With trains running at higher speeds throughout the route, safety at all at-grade crossings needs to be considered.
In Australia, the levels of upgrade of the crossing in the rail improvements project were based on the risk analysis. The improvements included flashing light protection, automatic full barriers protection, and pedestrian gates crossings. The project also introduced the use of rubber panels at the crossings.[39]
In the United States, the FRA limits train speeds to 110 mph (180 km/h) without an "impenetrable barrier" at each crossing. Even with that top speed, the grade crossings must have adequate means to prevent collisions. Another option is grade separation, but it could be cost-prohibitive and the planners may opt for at-grade crossing improvements instead.[31]
The safety improvements at crossings can be done using combination of techniques. This includes passive devices such as upgraded signage and pavement markings. Another low-cost passive device is median separators which are installed along the center line of roadways, extending approximately 70 to 100 feet from the crossing, to discourage drivers from running around the crossing gates. More active devices include the four-quadrant gate, which blocks both sides of each traffic lane. Longer gate arms can cover 3/4 of the roadway. Video cameras can also be installed to catch the violators. A signal monitoring system can also be installed to alert the crews when the crossing equipment has malfunctioned.[53]

Rerouting and passing sidings[edit]

In areas where there is frequent interference between freight and passenger trains due to congestion which causes the passenger trains to slow down, more extensive improvements may be needed. Certain segments of the line in congested area may need to be rerouted. New track may need to be laid to avoid many curves which slow down the trains. In stretches of heavy freight train traffic, adding passing sidings along the segment should be considered. Sometimes certain stations may need to be bypassed.[54]

Electrification[edit]

The "Main Line" portion of the Keystone Corridor which is fully electrified.
Another consideration is electrification. Electrifying a railway line entails a major upgrade to the rail infrastructure and equipment. On the infrastructure side, it requires catenary lines to be built above the tracks. New transmission lines are needed to carry power from the power plants. Substations are required for each of the 40-mile (64 km) lengths to reduce severe voltage losses. There is also a need to consider the required amount of power supply and new power plants may be required. For locomotives, new electric locomotives are needed or existing diesel-electric locomotives can be retrofitted into all-electric locomotives, but it is a complicated task.[55] These factors cause electrification to have high initial investment costs. The advantages of all-electric locomotives are that they provide quieter, cleaner and more reliable operations than the diesel-electric counterpart. The fuel consumption, locomotive maintenance costs and track wear of all all-electric locomotives are also lower.[56]
An alternative to catenary lines is to use a third rail system which has a semi-continuous rigid conductor placed alongside or between the rails of a railway track. However the operating speeds of this type of systems cannot be greater than 100 mph (160 km/h) due to its limitation of the power supply gaps at turnouts and grade crossings. Therefore, the third rail system is not generally used for higher-speed rail.[57]
One example in the United States that does involve electrification is the Keystone Improvement Project to provide higher-speed rail service along the Harrisburg-Pittsburgh segment of the Keystone Corridor in Pennsylvania. The plan includes additional track, a new signal system and electrification. If completed as planned, this would allow Amtrak to utilize electric power continuously on service from Philadelphia to Pittsburgh. The first segment ("Main Line") has already been using electric locomotives with a top speed of 110 mph (180 km/h).[58]

In operation[edit]

Australia[edit]

In 1999, the concept of Regional Fast Rail project was initiated by the State Government of Victoria with a goal to provide express higher-speed rail services between 4 main regional centers of Victoria (GeelongBallaratBendigo and the Latrobe Valley) and Melbourne. The initiative included a key component to upgrade rail infrastructure to have top speeds up to 160 km/h (99 mph). The development phase of initiative was between 2000 and 2002. Finally, the services on four lines began between 2005 and 2006 with top speeds of 160 km/h using VLocity trains.[59]

Greece[edit]

Since 1997, ongoing construction to upgade and built higher-speed lines capable of speeds of up to 200 kph is conducted. The P.A.Th.E. Plan (Patras-Athens-Thessaloniki-Efzonoi), as it is called aims at reduced journey times between Greece's main cities (Athens, Thessaloniki and Patra) as well as an improved rail connection between Greece and the Former Yugoslavic Republic of Macedonia. Currently, only the Domokos-Thessaloniki, Athens Airport-Kiato and Athens Central Station-Leivadia Lines are complete and the Leivadia-Leianokladi, Leianokladi-Domokos, Piraeus Harbour (Athens)-Athens Central Station, Nothern Peloponnese Lines, Patras Link and the Thessaloniki-Efzonoi Line are under construction/planning. Moreover, the lines will become upgradeable to 250 kph, something that will make them true high-speed rail.

United States[edit]

This is the list of the current higher-speed rail services from the East Coast to the West Coast:
Corridor / SegmentService nameLength (miles)EquipmentPowerTop speed (mph)Avg speed (mph)Note
Washington, DCBoston, MANortheast Regional664AEM-7 / ACS-64Electric12553[60][61]
New York CityAlbany/Schenectady, NYEmpire158P32AC-DMDiesel-electric11056[21]
Philadelphia–Harrisburg, PAKeystone104AEM-7Electric11066[21] Improvements of grade crossings in progress to increase speeds up to 125 miles per hour (200 km/h)[62]
Chicago, IL–Detroit/Pontiac, MIWolverine304P42DCDiesel-electric11057As of 2014, a 97-mile (156 km) portion allows speeds up to 110 mph (180 km/h). Another portion of 135 miles (217 km) is under construction to increase to those speeds.[21][63]
Chicago, IL–Port Huron, MIBlue Water319P42DCDiesel-electric110As of 2014, a 97-mile (156 km) portion allows speeds up to 110 mph (180 km/h).[63][64]
Chicago, IL – St. Louis, MOLincoln284P42DCDiesel-electric110Only 15-mile segment of Dwight – Pontiac, IL in 110 mph. To be expanded to cover 75% of route in 2015.[65]
Chicago, IL–Los Angeles, CASouthwest Chief2,256P42DCDiesel-electric9055[66]
Los Angeles–San Diego, CAPacific Surfliner130EMD F59PHIDiesel-electric9055[21] There is a study in place to increase maximum speed to 110 miles per hour (180 km/h) when funding is available.[67]

Earlier attempts[edit]

Canada[edit]

There have been several different attempts at higher speed rail in the Windsor-Quebec City Corridor, and several high speed rail attempts as well.[4]

Ireland[edit]

In 2010, there was a report commissioned by the Chartered Institute of Logistics and Transport as a mid-term review of Transport 21, an Irish infrastructure plan announced in 2005. The report recommended, among other things, a development of national rail to provide higher-speed rail services.[68] However, there have been no progress toward the recommendation.

United States[edit]

There have been long-range visions to establish high/higher-speed rail networks in different regions of the United States but without adequate funding. During theAmerican Recovery and Reinvestment Act of 2009, there was a surge of interest to apply for grants from the federal government to start those projects. However, many proposals have been put on hold or cancelled after failing to secure funding or support from the public or key local politicians.[69][70]

Amtrak Cascades[edit]

Main article: Amtrak Cascades
Amtrak Cascades, a 467-mile (747 km) intercity rail service, stretches from Eugene, Oregon, through the State of Washington to Vancouver, British Columbia, in Canada. As of 2010, the long-term goal of this corridor was to have the top speeds of the segment of Eugene, Oregon, to Blaine, Washington, with top speeds in the 90 to 120 mph (140 to 190 km/h) range, and eventually 150 mph (240 km/h) on a dedicated track.[71] However, as of 2012, the Washington State Department of Transportation plans for its 300-mile (480 km) stretch to have top speeds of only 79 mph (127 km/h),[72] and the plan in Oregon is to limit the speeds to 79 mph as well, with safety and other freight service concerns voiced by the track owner, Union Pacific Railroad.[73] This essentially halts the plan to provide a higher-speed rail service on this corridor in the near future.

Minnesota[edit]

As an alternative to the plan to link Madison with Minneapolis–Saint Paul, the Minnesota transportation planners established another plan to create a higher-speed rail service called the River Route with top speeds of 110 mph (180 km/h) between Minneapolis–Saint Paul, Minnesota, and Chicago, Illinois, via Milwaukee, Wisconsin, which follows the Empire Builder route.[74] There is no current progress with the River Route project due to the cancellation of the funding in Wisconsin.
Another alternative that has been discussed is to have a new route that heads south to Iowa to join the rail link from Iowa to Chicago.[75] There was a report in 2011 that Iowa would halt its involvement in high/higher-speed rail projects.[76] However, the Iowa Department of Transportation and Illinois Department of Transportationcontinue to pursue the study of rail link between Chicago and Omaha, Nebraska, through Iowa with top speeds of 110 mph (180 km/h).[77][78] Therefore, the status of the proposal to link Minneapolis–Saint Paul with Chicago via Iowa is unknown.
The higher-speed rail project within Minnesota called Northern Lights Express is expected to proceed without any impact by the uncertainty in other states.[79]

New York[edit]

Main article: Turboliner § RTL-III
An un-rebuilt RTL Turboliner in New York in 1983.
In 1998, New York State initiated a $185 million program in partnership with Amtrak to increase the speeds of the Empire Service to 125 mph (200 km/h) by reconstructing all seven gas-turbine Turboliner trainsets, originally built in 1976–1977, to the new RTL-III specification. The reconstructed trains, coupled with track improvements, would cut the travel time between New York City and Albany by 20 minutes. However, the project ran into many problems including issues with the trains and the unsuccessful implementation of required track improvements.[80] New York ended the rehabilitation program in 2005 after spending $70.3 million.[81] Fallout over the program led to litigation between New York and Amtrak; Amtrak would eventually pay New York $20 million and commit to funding $10 million in track improvements.[82] New York auctioned off its surplus Turboliners in 2012 for $420,000.[83]

Ohio[edit]

Main article: Ohio Hub
The Ohio Hub, a rail improvement project proposed by the Ohio Department of Transportation, is aimed at revitalizing passenger rail service in the Ohio region. The proposal was to increase the top speeds to 110 mph (180 km/h) in the network connecting ClevelandColumbus, and Cincinnati – commonly referred as the 3-C corridor.[84] The project is currently in an unknown state after the U.S. government rescinded the federal funding from Ohio and redirected it to other states.[69]

Wisconsin[edit]

In October 2009, the Wisconsin Department of Transportation adopted the Connections 2030 plan which is the long-range plan for state transportation needs. The plan includes Wisconsin Rail Plan 2030, the twenty-year plan to improve the state railroad system by 2030. In the rail plan, there is a multi-phase project to upgrade the rail service from Chicago, Illinois, to Milwaukee and Madison, Wisconsin, with top speeds of 110 mph (180 km/h). The latter phases of the project will expand the same service to Minneapolis–Saint Paul in Minnesota and another route to Green Bay, Wisconsin.[85] There was a reaction against the project in 2010, and the $810 million grant the state originally received for the project from the federal government was rescinded.[69] As of 2012, the rail plan is postponed indefinitely.[86]

Current efforts[edit]

Baltic states[edit]

The three Baltic states have been working with the European Union as part of the Trans-European Transport Networks (TEN-T) initiative on a study to build a higher-speed rail line in the Rail Baltica corridor to connect Warsaw, in Poland, and Tallinn, in Estonia.[87]

Canada[edit]

For a rail route to connect Windsor, Ontario to Detroit, Michigan in the United States, a higher-speed rail plan was proposed as an alternative after a study on the Windsor to Quebec City route in Canada was to consider only high-speed rail with top speeds of 200 km/h (124 mph) or more. Politicians in Windsor area proposed in 2012 that having higher-speed rail connection between Windsor and Detroit must be part of the consideration.[26][88][89]
Another feasibility study is ongoing as part of the Northern New England Intercity Rail Initiative to connect between Boston and Montreal trains at top speeds of 90 mph (140 km/h).[90]

India[edit]

In October 2013, the Minister of Railways announced at the two-day international technical conference on High Speed Rail Travel; Low Cost Solution that the focus of India's rail improvement is to implement a lower cost solution to meet the immediate needs by providing higher-speed rail services as an incremental step before the dedicated track high-speed rail can be achieved. India's higher-speed rail will be in the range of 160 and 200 km/h (99 and 124 mph).[14] On 3 July 2014, a trail run with the new top speeds of 160 km/h (99 mph) was successfully completed on a journey of 200 km (120 mi) between Delhi and Agra. The new service, to be in operation in November 2014, will cut the travel time from 126 minutes by the current trains with top speeds of 150 km/h (93 mph) down to 99 minutes.[91]

United States[edit]

This is a partial list of ongoing higher-speed rail projects from the East Coast to the West Coast.
Corridor / SegmentLength (miles)Top speed (mph)Avg speed (mph)Current statusNote
Boston, MA – Springfield, MA –Montreal, Canada4089055Feasibility studyA study of higher-speed rail options with top speeds of 90 mph (140 km/h) in 3 sections along the route.[90][92][93]
Springfield, MA – New Haven, CT62110Construction[94][95]
New York City – Niagara Falls, NY46312585Tier 1 EISFully electrified track, and straightened Hudson River route. See (*)
Washington, DC – Richmond, VA11590Tier 2 EIS[96][97][98]
Richmond – Newport News, VA90Tier 1 EIS[98]
Richmond – Norfolk, VA110Tier 1 EIS[98]
Richmond, VA – Raleigh, NC16011087Tier 2 EISTop speeds from Richmond, VA, to south of Petersburg, VA, will be 90 mph and changed to 110 mph after that.[99]
Raleigh – Charlotte, NC18090Construction[98]
Charlotte, NC – Atlanta, GA245110Tier 1 EISA 110 mph (180 km/h) option is considered along with 150 mph (240 km/h) high-speed rail.[98]
Atlanta, GA – Macon, GA –Jacksonville, FL408 / 36890-100 / 13077 / 94Tier 1 EISSee (**)
Atlanta, GA – Chattanooga /Nashville, TN – Louisville, KY489 / 42890-100 / 13072 / 85Tier 1 EISSee (**)
Atlanta, GA – Birmingham, AL176 / 15090-100 / 13064 / 90Tier 1 EISSee (**)
Miami – Orlando, FL230110ConstructionAll Aboard Florida (private investment)[100][101]
Columbus, OH – Fort Wayne, Indiana – Chicago, IL300110Feasibility StudyInitial operating speeds up to 110 mph.[102] Study funded by local governments and organizations, not by state governments.[103]
Chicago, IL – Milwaukee, WI869059Environmental AssessmentThe top speeds of 90 mph (140 km/h) is one of the alternatives under consideration.[104]
Chicago, IL – Omaha, NE (via Iowa)474-516110Tier 1 EIS[77][78]
Minneapolis – Duluth, MN155110Environmental reviewsNorthern Lights Express[105]
St. Louis, MO – Kansas City, MO283[106]90ConstructionNew sidings between Jefferson City and Lee's Summit for 90 mph service[107]
Oklahoma City, OK – San Antonio, TX850110Feasibility StudySee (***)
Dallas/Fort Worth – Houston, TX239110Feasibility StudySee (***)
Phoenix - Tucson, AZ120 / 132 / 113125[108]66 / 90 / 92Tier 1 EISThree alternatives finalized by Arizona Department of Transportation.[109]
* The study includes higher-speed rail alternatives with top speeds of 90 (options A and B), 110 and 125 mph. It also has high-speed rail options with top speeds of 160 and 220 mph. As of March 2012, the Tier 1 EIS has eliminated the high-speed rail options. The only 4 build alternatives are in higher-speed rail range. The numbers on the table represent the 125 mph alternative. The other alternatives are for non-electrified track with average speeds of 57 mph (for 90A option), 61 (for 90B option), and 63 (for 110 option).[110]
** The study includes two main alternatives for higher-speed rail. The first alternative is called Shared Use with top speeds of 90-110 mph. The second alternative is called Hybrid High Performance with top speeds of 130 mph. There are also high-speed rail alternatives in the same study with top speeds of 180-220+ mph. The numbers on the table represent the first two higher-speed rail alternatives.[111]
*** The study includes higher-speed rail up to 110 mph and high-speed rail of 150+ mph options.[112]

Proposed routes[edit]

In addition to ongoing projects, there are proposed routes that have not reached the feasibility study stage yet. In Pennsylvania, a rail advocacy group started fund raising efforts in 2014 to obtain $25,000 for a preliminary study and additional $100,000 for feasibility study of the route from Erie to Pittsburgh. The proposal is for 110 mph (180 km/h) express train services to directly link the two cities. An alternative is to have intermediate stops in Ohio cities including AshtabulaWarren, andYoungstown before heading back to New Castle, Pennsylvania.[113]
In Ohio, a rail advocacy group works with local political leaders in Ohio, Indiana and Illinois to consider a higher-speed rail line from Cincinnati to Chicago. This is in response to another advocacy group in Indiana that gained funding for the Columbus, Ohio – Fort Wayne – Chicago route that is already in feasibility study stage. The group persuaded the Hamilton County government in Ohio to advocate for the study.[114] The county commissioners unanimously voted in September 2014 to pursue a feasibility study. As a possible route that goes through the states of Kentucky and Indiana, the county expects that Ohio-Kentucky-Indiana Regional Council of Governments will help fund a feasibility study.[115]
In Texas, the East Texas Corridor Council proposed a higher-speed rail route between Longview and Dallas. The trains will operate at speeds of 80 mph (130 km/h) and 110 mph (180 km/h).[116]

Thailand[edit]

The Government of Thailand considers a plan to build out its high-speed rail corridors. As an alternative to the high-speed trains, the government also considers medium-speed trains with top speeds of 250 km/h (160 mph).[25]

See also[edit]

References[edit]

  1. Jump up^ Bowen, Douglas John (27 August 2012). "U.S. HSR accelerates"Railway Age. Retrieved 10 October 2012.
  2. Jump up^ "H.R.4361 -- National High Performance Passenger Rail Transportation-Oriented Development Act of 2012" 112th Congress of the United States. Retrieved 10 September 2013.
  3. Jump up^ Clayton, Mark (21 August 2012). "Obama plan for high-speed rail, after hitting a bump, chugs forward again"Christian Science Monitor. Retrieved 10 October2012.
  4. Jump up to:a b c "Ms. Helena Borges (Director General, Surface Transportation Policy, Department of Transport) at the Transport, Infrastructure and Communities Committee". Canada Parliament. 12 May 2009. Retrieved 31 August 2013.
  5. Jump up^ Safety of High Speed Ground Transportation Systems (PDF) (Report). Federal Railroad Administration. December 1994. Retrieved 3 July 2014.
  6. Jump up^ "Fierce competition among Japanese, Korean, Chinese and French firms to win contracts for the Thai high speed"Asia Public Transport News Channel. Retrieved 19 January 2014.
  7. Jump up^ "India-China to collaborate on building semi-high speed rail". The Economic Times. 29 March 2014. Retrieved 4 July 2014.
  8. Jump up^ Hahn, Johannes (11 November 2013). "From Passengers to Captains of Europe's Baltic Sea Strategy" (PDF)4th Annual Forum on the EU Strategy for the Baltic Sea Region. European Commission. Retrieved 13 November 2013.
  9. Jump up^ "40th Parliament, 2nd Session Standing Committee on Transport, Infrastructure and Communities". Canada Parliament. 9 June 2009. Retrieved 31 August2013.
  10. Jump up to:a b "Section 5 Rail Transportation" (PDF)Congestion Management Process (CMP). North Central Texas Council of Governments. p. V-14. Retrieved31 August 2013.
  11. Jump up^ Thoren, Thomas (9 December 2012). "Team Studies Track Components for Shared-Use Rail Lines". University of Illinois. Retrieved 31 August 2013.
  12. Jump up^ Thompson, Louis S. (October 1994). "High-Speed Rail (HSR) in the United States - Why Isn't There More?" (PDF)Japan Railway & Transport Review: 37.
  13. Jump up^ Galuszka, Peter (13 June 2011). "The other reason Virginia didn’t seek rail money (WP Opinions)"Washington Post. Retrieved 31 August 2013.
  14. Jump up to:a b "Railway Minister Launches High Speed Rail Corporation of India Limited (HSRC)"Disha Diary. 29 October 2013. Retrieved 13 November 2013.
  15. Jump up^ "Written evidence from Paul Atkins (HSR 07)". UK House of Commons - Transport Committee. Retrieved 11 January 2015.
  16. Jump up^ Lind, William (11 May 2011). "Run a Train That’s Fast Enough"Engineering News-Record. Retrieved 10 October 2012.
  17. Jump up^ "Higher Speed Rail in North Carolina and Virginia: Lengthening and Strengthening the Northeast Corridor (NEC)" (PDF). Regional Transportation Alliance. Retrieved 10 October 2012.
  18. Jump up^ "FAQ". The Cascadia High Speed Rail. Retrieved 10 October 2012.
  19. Jump up to:a b "Tier I Draft Environmental Impact Statement: Open House and Public Hearing" (PDF). Virginia Department of Rail and Public Transportation. Retrieved10 October 2012.
  20. Jump up^ "High-Speed Rail Strategic Plan" (PDF). Federal Railroad Administration. April 2009. p. 10. Retrieved 16 April 2009.
  21. Jump up to:a b c d e f "The Development of High Speed Rail in the United States: Issues and Recent Events" (PDF). Congressional Research Service. Retrieved 10 October2012.
  22. Jump up^ "Next-Generation Rail Supply Chain Connectivity Forum, Sacramento, California". National Institute of Standards and Technology and Manufacturing Extension Partnership. 8 February 2012. p. 6. Retrieved 22 January 2014.
  23. Jump up^ "State Aviation System Plan" (PDF). Minnesota Department of Transportation. July 2013. p. 200. Retrieved 22 January 2014.
  24. Jump up to:a b "Types of passenger rail" (PDF)Texas-Oklahoma Passenger Rail Study Newsletter 2 (1): 2. Winter 2014.
  25. Jump up to:a b "New plan: medium speed trains, not high speed"Bangkok Post. 29 August 2013. Retrieved 19 January 2014.
  26. Jump up to:a b "Deliverable No. 12 – Review of Impacts of HSR on the Transportation System within the Corridor" (PDF)Updated Feasibility Study of a High Speed Rail Service in the Québec City – Windsor Corridor. Ministère des Transports du Québec, Ontario Ministry of Transportation, and Transport Canada. November 2010. Retrieved 17 November 2012.
  27. Jump up^ "Code of Federal Regulations - Title 49 - Transportation". Retrieved20 October 2012.
  28. Jump up^ "Chapter 5 Track Safety Standards Classes 1 through 5" (PDF)Track Safety Standards Compliance Manual. Federal Railroad Administration. Archived fromthe original (PDF) on 28 May 2008. Retrieved 4 November 2012.
  29. Jump up^ "Chapter 6 Track Safety Standards Classes 6 through 9, p. 6.13" (PDF).Track Compliance Manual. Federal Railroad Administration. Archived from the original (PDF) on 23 September 2003. Retrieved 4 November 2012.
  30. Jump up^ High Speed Passenger Rail Safety Strategy (PDF). Federal Railroad Administration. 2009. p. 23. Archived from the original (PDF) on 11 September 2011. Retrieved 7 November 2012.
  31. Jump up to:a b "High-Speed Grade Crossings". Federal Railroad Administration. Retrieved20 October 2012.
  32. Jump up^ "Ten Years of Work Needed Before New Trains Can Reach Top Speed".Estonian Public Broadcasting. 21 May 2013. Retrieved 17 November 2014.
  33. Jump up^ Kartläggning av plankorsningar - B05-690/TR00 (Swedish) (PDF). Banverket. 30 June 2006. Archived from the original (PDF) on 21 May 2013. Retrieved17 November 2014.
  34. Jump up^ "High-Speed Russian Train Stirs Anger"Bloomberg BusinessWeek. 12 July 2010. Retrieved 17 November 2014.
  35. Jump up^ Hoover, Ryan (20 July 2006). "Mini-Shinkansen: How East Japan Railway Co. extended high-speed rail without huge infrastructure expenditures" (PDF). BayRail Alliance. Retrieved 28 September 2014.
  36. Jump up to:a b "High Speed Lines in the World" (PDF). International Union of Railways. 1 September 2014. Retrieved 27 September 2014.
  37. Jump up^ "AVE-Long Distance Products". Renfe. Retrieved 13 November 2013.
  38. Jump up^ "Getting around Sweden by Train". VisitSweden. Retrieved 13 November2013.
  39. Jump up to:a b Marchant, Kevin. "The Regional Fast Rail Project - A Technical Focus"(PDF). Australian Construction Achievement Award. Retrieved 19 January 2014.
  40. Jump up^ "Pacific Surfliner Corridor Los Angeles to San Diego - Service Development Plan" (PDF). California Department of Transportation. Retrieved 21 October2012.
  41. Jump up^ "Positive Train Control Overview". Federal Railroad Administration. 7 June 2012. Archived from the original on 4 September 2012. Retrieved 21 October2012.
  42. Jump up^ Sonoma-Marin Area Rail Transit Project SCH #2002112033 Concrete Rail Ties CEQA Addendum to 2006 FEIR (PDF). Sonoma-Marin Area Rail Transit District. January 2011. p. 6. Retrieved 17 November 2014.
  43. Jump up^ "At a Glance: Railway Sleeper Materials"Railway-technology.com. 6 August 2010. Retrieved 17 November 2014.
  44. Jump up^ "Continuous welded rails strengthen network"Creamer's Media Engineering News. 27 June 2014. Retrieved 17 November 2014.
  45. Jump up^ Deveney, Thomas J. (19 March 2004). "Regional Fast Rail - Project Overview". IRSE Technical Convention. Retrieved 19 January 2014.
  46. Jump up^ Technical Monograph: Transportation Planning for the Richmond–Charlotte Railroad Corridor (FRA/RDV-04/02) (PDF) (Volume II ed.). Federal Railroad Administration. 2004. Archived from the original (PDF) on 6 September 2012.
  47. Jump up^ "AMTRAK REQUESTS LESS FEDERAL OPERATING SUPPORT" (PDF).Amtrak Press Release. 3 February 2012. Retrieved 21 October 2012.
  48. Jump up^ "Automatic Train Control and Advanced Civil Speed Enforcement System; Northeast Corridor Railroads" (PDF). Federal Railroad Administration. Archived from the original (PDF) on 27 May 2010. Retrieved 21 October 2012.
  49. Jump up^ "Track improvements: Raleigh - Greensboro". NCDOT. Archived from the original on 27 September 2013. Retrieved 21 October 2012.
  50. Jump up^ "TRT 909". IDOT High Speed Rail. Retrieved 21 October 2012.
  51. Jump up^ "TRT-909 Track Renewal System"http://www.harscorail.com/services/track-renewal-TRT-909.aspx. Archived from the original on 18 January 2013. Retrieved 21 October 2012.
  52. Jump up^ "Catenary Improvements Continue on Metro-North's New Haven Line". MTA. Retrieved 22 October 2012.
  53. Jump up^ "Sealed Corridor Program". NCDOT. Retrieved 22 October 2012.
  54. Jump up^ "WSDOT Summary of Track 1 Projects" (PDF). Retrieved 22 October 2012.
  55. Jump up^ Freeman, Richard; Cooper, Hal. "Why Electrified Rail Is Superior". 21st Century(Summer 2005): 28.
  56. Jump up^ "Current Developments in UK Rail: An Electrifying Future". Railway-technology.com. 9 December 2010. Retrieved 28 September 2014.
  57. Jump up^ Yadav, Anil (4 February 2013). "Traction choices: overhead ac vs third rail dc"International Railway Journal. Retrieved 17 November 2014.
  58. Jump up^ Cotey, Angela. "Keystone Corridor"Progressive Railroading. Retrieved20 October 2012.
  59. Jump up^ "Results of special audits and other investigations, August 2006". Auditor General Victoria. Retrieved 13 November 2013.
  60. Jump up^ "Amtrak and High Speed Rail in America - November 9, 2010" (PDF). Amtrak. Retrieved 21 October 2012.
  61. Jump up^ Vantuono, William C. (29 September 2014). "ACS-64 technical support agreement under way"Railway Age. Retrieved 15 October 2014.
  62. Jump up^ "Keystone Corridor East High Speed Phase II". planthekeystone.com. Archived from the original on 21 October 2013. Retrieved 20 July 2013.
  63. Jump up to:a b Davis, Wynne; Hoeffner, Tim (4 August 2014). "2014 FRA Rail Program Delivery: MICHIGAN T.O. 5 Midwest"Federal Rail Administration. Retrieved17 January 2015.
  64. Jump up^ "AMTRAK 110 MPH MICHIGAN SERVICE GIVEN GREEN LIGHT" (PDF).Amtrak MDOT Press Release. 7 February 2012. Retrieved 23 October 2012.
  65. Jump up^ Associated Press (23 November 2012). "110 mph train service starts on part of Chicago-St. Louis route"Crain's Chicago Business. Retrieved 20 July 2013.
  66. Jump up^ Wolfe, Thomas (27 July 2005). "Passengers on Amtrak’s Southwest Chief Experience a Community Away From Home"Red Orbit. Retrieved 21 October2012.
  67. Jump up^ "Regional Transportation Plan 2012-2035" (PDF). Southern California Association of Governments. p. 9. Retrieved 11 January 2015.
  68. Jump up^ "T21 Midterm Review" (PDF). Chartered Institute of Logistics and Transport (Ireland). November 2010. Retrieved 29 July 2013.
  69. Jump up to:a b c Lambert, Lisa (9 December 2010). "U.S. yanks high-speed rail funds for Wisconsin and Ohio"Reuters. Retrieved 3 November 2012.
  70. Jump up^ "Rejected by Florida, U.S. reallocates $2 billion for high-speed rail"CNN. 10 May 2011. Retrieved 3 November 2012.
  71. Jump up^ "Washington to get $590 million for high-speed rail improvements"The Seattle Times. 27 January 2010. Retrieved 22 October 2012.
  72. Jump up^ "High-Speed Rail Program". WSDOT. Retrieved 22 October 2012.
  73. Jump up^ "Corridor Forum Meeting #1 – Summary" (PDF)Oregon Passenger Rail - Eugene Portland. Oregon Passenger Rail. Retrieved 3 November 2012.
  74. Jump up^ "River Route: Twin Cities to Chicago". Minnesota High-Speed Rail. Retrieved3 November 2012.
  75. Jump up^ "Dayton has hopes for high-speed rail in Minn."Minnesota Public Radio. 25 February 2011. Retrieved 4 November 2012.
  76. Jump up^ "Branstad kills Iowa involvement in high-speed rail"The Daily Iowan. 22 August 2011. Retrieved 4 November 2012.
  77. Jump up to:a b "Tier 1 Service Level EIS: Chapter 2 - Alternatives" (PDF)Chicago to Council Bluffs-Omaha Regional Passenger Rail System Planning Study. Iowa Department of Transportation. Retrieved 4 November 2012.
  78. Jump up to:a b "Omaha to Chicago (and possibly through Iowa City) Railway Route Study to Kick off this Month"Iowa City Patch. 6 February 2012. Archived from the original on 29 May 2014. Retrieved 4 November 2012.
  79. Jump up^ Levy, Paul (29 June 2014). "Plans for $1B rail line from Minneapolis to Duluth chugging along"Star Tribune West Metro. Retrieved 17 November 2014.
  80. Jump up^ Kaplan, Thomas (31 May 2012). "For Sale: 4 Weedy, Rusty Relics of a Doomed Rail Project"The New York Times. Retrieved 8 November 2012.
  81. Jump up^ Woodruff, Cathy (28 May 2005). "Express rail plan hits end of line"Times Union. Archived from the original on 17 August 2014.
  82. Jump up^ Woodruff, Cathy (13 December 2007). "Track cleared for upgrades; State suit settled; Amtrak to pay $20M, make improvements"Times Union. Archived from the original on 17 August 2014.
  83. Jump up^ Karlin, Rick. "State's rusting trains sell for $420,000". Retrieved 13 December2012.
  84. Jump up^ "The Ohio & Lake Erie Regional Rail Ohio Hub Study: Technical Memorandum & Business Plan" (PDF)The Ohio Hub. Ohio Department of Transportation. July 2007. Archived from the original (PDF) on 18 April 2012. Retrieved3 November 2012.
  85. Jump up^ "Chapter 6: Intercity Passenger Rail" (PDF)Wisconsin Rail Plan 2030. Wisconsin Department of Transportation. Retrieved 3 November 2012.
  86. Jump up^ "Wisconsin Rail Plan 2030 - Draft plan"Wisconsin Rail Plan 2030. Wisconsin Department of Transportation. Retrieved 3 November 2012.
  87. Jump up^ "Rail Baltica Final Report Volume I" (PDF). AECOM Limited. May 2011. Retrieved 13 November 2013.
  88. Jump up^ "Masse Rolls Out Need for Speed Campaign". Office of Brian Masse. Retrieved 17 November 2012.
  89. Jump up^ "Windsor politicians disagree with rail study"CBCNews. 18 October 2012. Retrieved 17 November 2012.
  90. Jump up to:a b Preliminary Service Options Performance Report (PDF)Northern New England Intercity Rail Initiative (Report) (massDOT). April 2014: 11,. Retrieved21 January 2015.
  91. Jump up^ Singh, Mahendra (4 July 2014). "Delhi to Agra in 99 minutes; train hits 160 kmph on trial run". The Times of India. Retrieved 4 July 2014.
  92. Jump up^ "Public Meetings White River, VT & Springfield, MA January 22 and 23, 2014" (PDF)Northern New England Intercity Rail Initiative. massDOT. Retrieved 21 January 2015.
  93. Jump up^ "Stakeholder Meeting Pioneer Valley Planning Commission May 7, 2014"(PDF)Northern New England Intercity Rail Initiative. massDOT. Retrieved21 January 2015.
  94. Jump up^ "Environmental Assessment". New Haven-Hartford-Springfield Rail Project. Retrieved 18 December 2014.
  95. Jump up^ "New Haven - Hartford - Springfield Rail Program Newsletter" (PDF)NHHR Rail (Fall 2014). Retrieved 18 December 2014.
  96. Jump up^ "Virginia-North Carolina Interstate High-Speed Rail Compact: Lengthening and Strengthening the Northeast Corridor (NEC) - April 20, 2012" (PDF). Regional Transport Alliance. Retrieved 22 October 2012.
  97. Jump up^ "Public to Weigh in on D.C. to Richmond Higher Speed Passenger Rail".U.S. Department of Transportation Federal Railroad Administration Press Release. 6 October 2014. Retrieved 15 October 2014.
  98. Jump up to:a b c d e Randy Brown; Jason Orthner (4 August 2014). 2014 FRA Rail Program Delivery: Southeast Region (Report). Federal Railroad Administration. Retrieved16 January 2015.
  99. Jump up^ Recommendation Report: Southeast High Speed Rail Richmond, VA to Raleigh, NC, Tier II Environmental Impact Statement (PDF) (Report). DRPT and NCDOT. p. 10. Retrieved 19 May 2014.
  100. Jump up^ "Mica Sets High-Speed Approval for Miami-Orlando Private Rail Service".U.S. Rep. John L. Mica Press Release. 18 June 2012. Retrieved 22 October2012.
  101. Jump up^ Turnbell, Michael. "Demolition begins for All Aboard Florida's new station".Sun Sentinel. Retrieved 11 January 2015.
  102. Jump up^ Barrow, Keith (18 July 2013). "Columbus – Chicago passenger rail study published"International Railway Journal. Retrieved 20 July 2013.
  103. Jump up^ LeDuc, Doug (9 March 2012). "Support for passenger rail study gains steam".FW Daily News. Retrieved 20 July 2013.
  104. Jump up^ "Chicago-Milwaukee Environmental Assessment & Service Development Plan: Agency Stakeholder Meeting" (PDF)Wisconsin Department of Transportation. 2 December 2014. Retrieved 19 January 2015.
  105. Jump up^ Kerr, Drew (23 August 2012). "Hope remains for high-speed link to Duluth".Finance & Commerce. Retrieved 24 October 2012.
  106. Jump up^ "March 2011 Narrative Application Form – Individual PE/NEPA, Part I: MO-KC to STL Corridor-Pleasant Hill to Jefferson City (90 mph) PE/NEPA" (PDF). Missouri Department of Transportation. Retrieved 13 February 2013.
  107. Jump up^ "Show Me Improved Rail Service" (PDF). Missouri Department of Transportation. April 2011. Retrieved 13 February 2013.
  108. Jump up^ Shadley, Steve (8 July 2013). "ADOT finalizes three proposed routes for Phoenix-Tucson commuter rail service"KJZZ 91.5. Retrieved 19 May 2014.
  109. Jump up^ "Final Alternatives 2013" (PDF). Arizona Department of Transportation. Retrieved 19 May 2014.
  110. Jump up^ "Online Briefing Winter 2011 ‐ 2012" (PDF)High Speed Rail Empire Corridor Project. New York Department of Transportation. Retrieved 8 November 2012.
  111. Jump up^ "Executive Summary: Atlanta Birmingham Corridor" (PDF)Tier 1 EIS. Georgia Department of Transportation. Archived from the original (PDF) on 18 November 2014. Retrieved 8 November 2012.
  112. Jump up^ "Coordination with TxDOT on Two Federally-Funded High Speed Rail Corridor Studies (July 22, 2011)" (PDF). North Central Texas Council of Governments. Retrieved 24 October 2012.
  113. Jump up^ Barron, Sean (5 September 2014). "Eastgate advisory board talks about high-speed rail service"The Vindicator. Retrieved 30 September 2014.
  114. Jump up^ Williams, Jason (23 September 2014). "High-speed rail to Chicago sought".Cincinnati.com. Retrieved 30 September 2014.
  115. Jump up^ "Hamilton County Commissioners Back High-Speed Rail"WKRC TV. 25 September 2014. Retrieved 30 September 2014.
  116. Jump up^ Jones, Peggy. "A bullet train in East Texas? Company plans to build Dallas-Houston route"News Journal, Longview, Texas. Retrieved 24 October 2012.